Nov 04,2025

Hebei Jinpeng Medical Waste Disposal Construction Project 15td Medical Waste Incineration

The Hebei Jinpeng Medical Waste Disposal Construction Project covers all the work involved from scheme design to the end of the warranty period; All work including (but not limited to) scheme design, procurement, construction, installation, commissioning, trial operation, performance testing, reaching production standards, defect elimination, acceptance, and final delivery of the project. This also includes requesting the cooperation of the owner, assisting the owner in handling construction application procedures, providing training for the operation and maintenance personnel of the contracting party, preparing training materials and process documents, etc. The total contract amount is 12260000 yuan.


Nov 04,2025

Rotary kiln Sichuan Shanshan

The project is established by Sichuan Shanshan New Materials Co., Ltd., with a total contract amount exceeding 5 million yuan. The project scope includes the design scheme, procurement, construction, commissioning, trial operation, performance acceptance, training, etc. of continuous production rotary kiln equipment (two heating kilns with a design temperature of 850 ℃ and a specification of Φ 1400 * 13000mm and a cooling kiln with a specification of Φ 1200 * 12000mm), conveying system, flue gas treatment system, and supporting auxiliary engineering. The equipment is used for processing artificial graphite negative electrodes, with an annual production capacity of 5000 tons and an annual operating days of 300 days.


Nov 04,2025

Shanxi Chenggong Solid Waste

Includes solid, semi-solid, and liquid forms. The main categories involved in the list of hazardous waste are HW02、HW03、HW04、HW05、HW06、HW07、HW08、HW09、HW11、HW12、HW13、HW14、HW016、HW37、HW38、7HW39、 HW40、HW45、HW49 Wait.


Nov 04,2025

Sichuan Shanshan horizontal kettle

The project is established by Sichuan Shanshan New Materials Co., Ltd., with a total contract amount exceeding 200 million yuan. The project scope includes 108 sets of 11m ³ horizontal reactor units, 30 sets of 6m ³ vertical reactor units, supporting electrical control cabinets, and on-site installation guidance. The equipment is mainly used for the granulation process of artificial graphite negative electrodes, with an annual production capacity of 200000 tons and an annual operating days of 300 days.


Nov 04,2025

Wanyang Hengshui Pharmaceutical Co., Ltd. Solid Liquid Incineration EPC Project

The project is established by Lingyao Pharmaceutical Wanyang Hengshui Branch, with a total contract amount of 20800000 yuan. The scope of the project includes the design scheme, procurement, construction, commissioning, trial operation, performance acceptance, training, and cooperation with environmental protection acceptance of solid waste, liquid waste incineration equipment, flue gas treatment system, and supporting auxiliary engineering generated in the factory area. Annual processing capacity: 7700 tons. The annual operating days are 300 days.


Nov 04,2025

Gas Phase Extraction Unit

Maximum extraction gas volume: 2'500 m3/h, maximum extraction water volume: 2'2.5 m3/h, maximum extraction negative pressure: -97 kPa, extraction airflow velocity: 10 m/s; Inlet VOCs concentration: ≤ 2000 mg/m ³, emission VOCs concentration: ≤ 40 mg/m ³; Inlet COD: ≤ 2000 mg/L, outlet COD: ≤ 500 mg/L.


Nov 04,2025

Mobile medical waste Inceneration System

Processing capacity of 2-5 tons per day; Incineration temperature: ≥ 850 ℃, flue gas residence time: ≥ 2S, incineration efficiency: 99.9%, thermal burn off rate of residue:<5%; Exhaust emission standards: "Pollution Control Standards for Hazardous Waste Incineration" (GB 18484-2020); The entire system is centralized in standard containers or trucks and can be operated on vehicles to handle combustible waste such as medical waste and household waste.


Nov 04,2025

Chengdu Pujiang County Soil Remediation Project

This project adopts indirect thermal desorption soil remediation technology. "Indirect thermal desorption" refers to the process of heating organic pollutants in the soil to the boiling point temperature of pollutants through indirect heat exchange under vacuum conditions or when a carrier gas is introduced, causing organic pollutants to evaporate and separate from the soil, and effectively collecting and treating the emitted pollutants.


Nov 04,2025

X Guangzhou Guangchuan Phase III Land Pollution Soil Remediation Project

The Guangzhou Guangchuan Phase III plot is located at No. 40 Fangcun Avenue South, Liwan District, Guangzhou City, within the Guangchuan International Co., Ltd. plot ("Guangchuan Plot"). The total amount of earthwork that needs to be repaired (or disposed of) within the plot is approximately 100463 m3, with a total repair area of 40738 m2 and a repair depth of 0-8m. The soil pollutants that need to be repaired include lead, arsenic, copper, zinc, nickel, fluoride,


Nov 04,2025

Panjin Restoration Project

The construction project for the remediation and treatment of polluted soil in the original factory area of Panjin North Asphalt Fuel Co., Ltd. is located 30 meters south of Binhai Avenue in Dawa District, Panjin City, Liaoning Province. The remediation depth of this project is 0-1.5 meters, and the remediation soil volume is 280746.78 cubic meters. The main pollutants are VOCs, SVOCs, and TPHs, which are treated by ex situ thermal desorption. This project has the characteristics of a large amount of restoration work and a short construction period, and most of the polluted soil is composite pollution, which increases the difficulty of construction. At the same time, due to the presence of organic polluted soil, there is a risk of volatile gases spreading to sensitive areas in the surrounding area. Therefore, this project has extremely high requirements for the professional quality of project management personnel and the control of the construction process. The project will be completed, repaired, and removed from the directory by March 27, 2025.